<%BANNER[top_768x90]%>
<%BANNER[banner_468x60_h]%>
<%BANNER[news_300]%>

News

<%BANNER[fp_160x600_r_1]%>
Intel at IDF, San Jose, disclosed plans to convert Fab 12, a 200mm wafer fabrication facility located in Chandler, Arizona, to a 300mm wafer fab. The conversion project, estimated to cost $2 billion, will begin in the first half of 2004 with production scheduled to begin in late 2005. The converted fab will be Intel’s fifth fab to start up production on 65nm process technology.

Intel currently has two 300mm fabs in operation; one in Hillsboro, Oregon, the second in Rio Rancho, New Mexico. Two other 300mm facilities are under construction. One in Oregon will begin operations later this year, and a facility currently under construction in Ireland is scheduled to begin operations in the first half of 2004.

Manufacturing with 300mm wafers dramatically increases the ability to produce semiconductors at a lower cost compared with the current standard 200mm wafers. The total silicon surface area of a 300mm wafer is 225% that of a 200mm wafer, and the number of printed die (individual computer chips) is increased to 240%. The bigger wafers lower the production cost per chip while diminishing overall use of resources. 300mm wafer manufacturing will use 40% less energy and water per chip than a 200mm wafer factory. On the other hand, the factory itself as well as 300mm wafers cost giant sums. According to analysts, a company that invests in 300mm fabs should be 100% sure in their full utilisation as well as in high average selling prices. It seems that Intel is really confident at the moment.

Separately, the company disclosed plans to sell 524 acres of land in Forth Worth, Texas. The land was purchased in 1997 as part of a planned manufacturing facility. However, changes in manufacturing technology and current construction projects at existing Intel sites mean the property is no longer part of the company's future plans. Therefore, we should expect Intel to upgrade the current facilities rather than building new fabs [in the USA?], as this strategy seems to be more reasonable in the current economic conditions.

<%BANNER[banner_468x60_f]%>

Discussion

<%BANNER[fp_160x600_r_2]%>
Comments currently: 0

You must log in to add comments.
Unfortunately, the old registrations do not work anymore. Please register again. We apologize for the inconvenience.

Forgot password? Registration

remember me



Latest News

Thursday, August 28, 2008

1:37 pm | AMD to Start Transition to New Platform Form-Factor in March, 2009. AMD to Ship First AM3 Processors in March, 2009

8:15 am | Rumours About Abit’s Exiting from Mainboard Business Resurrect. Abit to Stop Making Mainboards by Year End – Rumours

6:27 am | Nvidia Changes SLI Licensing Policy, Starts Mainboards Certification. Nvidia to Charge Mainboard Makers for SLI License

4:32 am | AMD’s First 45nm Desktop Microprocessors Set to Arrive on the 8th of January, 2009. AMD Phenom X4 45nm Expected to Hit Higher Clock-Speeds

Wednesday, August 27, 2008

11:54 pm | Fujitsu Preps “Venus” Eight-Core Sparc64 Processor. Sparc64 to Get Eight Processing Engines

4:26 pm | Qimonda Begins to Ship XDR Memory for Sony PlayStation 3. Qimonda Initiates XDR Shipments for Sony’s PlayStation 3

3:01 pm | One New Dual-Core AMD Athlon X2/K10 Processor Is Planned for September Launch, Say Sources. AMD Readies Athlon X2 6500, No Dual-Core Phenom Chips for Now

12:51 pm | Nvidia Does Not Plan to Develop Central Processing Units – Company. Nvidia Has No x86 CPU Ambitions, Says Co-Founder

9:34 am | Samsung Unveils Solid State Drives for Ultra Low-Cost Personal Computers. Samsung Bets on SSDs for Low-Cost Personal Computers