News
 

Bookmark and Share

(13) 

The demand for Kepler-family of graphics processing units has been growing in the recent months thanks to successful product launches and will likely get even higher as the company rolls-out mainstream parts as well as high-end professional solutions. Unfortunately, there are two challenges for Nvidia that will keep affecting its performance in the coming months: 28nm supply constraints and yields. 

Taiwan Semiconductor Manufacturing Company admits that it will not be able to meet demand for chips produced using its 28nm process technologies this calendar year, which means that Nvidia will unlikely get the desired amount of wafers processed using 28HP (28nm high-performance manufacturing technology with high-k metal gate) flavour of the tech, which results in limited revenue growth. Apparently, the yields of chips made using 28nm fabrication process are still below those manufactured at 40nm node, which means that Nvidia's profit margins are not as high as the company would like them to be.

"We are expecting to be supply constrained throughout this quarter and then we will report on that in Q4. Obviously, this is a combination of allocation, yield and the market demand, so there are a lot of variables. So far market demand seems very strong and we are selling into a marketplace with quite a bit of pent-up demand for Kepler," said Jen-Hsun Huang, chief executive officer of Nvidia Corp., during a recent conference call with financial analysts.

With the launch of 28nm production, TSMC not only increased pricing of its chips made using the latest manufacturing technology, but also started to sell wafers, not functional chips to its partners. Consequently, companies like AMD, Nvidia and Qualcomm now acquire not only good chips, but also those, which do not work. Therefore, their margins now depend on the yields like never before.

"When we started going into wafer buying, our margins are now very affected by improving yields. It is a very large lever and if there is anything that we can do to improve yields, it should be all hands on deck. There is just a lot more room to improve 28nm yield to the 40nm level. As we ramp further and further into 28nm and as we improve yield, it should improve our margins. The leverage would be quite significant, so we should be all hands on deck to improve yield. TSMC is already all hands on deck to improve yield. Nothing could be a greater lever for their ability to increase supply for all of their customers," stressed Mr. Huang.

Tags: Nvidia, TSMC, Geforce, Kepler, 28nm, Business, Tesla, Quadro, GK104, GK107

Discussion

Comments currently: 13
Discussion started: 08/14/12 06:04:29 PM
Latest comment: 08/16/12 03:34:18 AM
Expand all threads | Collapse all threads

[1-2]

1. 
Wow one whole year to bring out a line of cards, getting easier my a$$.
1 0 [Posted by: redeemer  | Date: 08/14/12 06:04:29 PM]
Reply
- collapse thread

 
show the post
1 10 [Posted by: BestJinjo  | Date: 08/15/12 08:21:39 AM]
Reply

2. 
It doesnt matter since the 7000 series is better anyways, once overclocked they beat out 600 series parts regardless of its clocks. A 7970 can be had for $429 and 7950 $349, @ 1.23v 1200mhz it whips the 680 no matter what. No compute man o man Nvidia screwed up big time this generation still waiting on the rest of their line up.
1 0 [Posted by: redeemer  | Date: 08/15/12 01:51:21 PM]
Reply
- collapse thread

 
show the post
0 10 [Posted by: BestJinjo  | Date: 08/15/12 05:28:16 PM]
Reply
 
show the post
1 10 [Posted by: BestJinjo  | Date: 08/15/12 05:29:35 PM]
Reply

[1-2]

Add your Comment




Related news

Latest News

Thursday, May 23, 2013

6:51 pm | OCZ Reveals Vertex 450 Solid-State Drives: High-End Performance at Mainstream Prices. OCZ Introduces New SSDs Based on Indilinx Barefoot 3 Controller

3:40 pm | Nvidia Unveils GeForce GTX 780: GK110-Based Consumer Solution for $649. Nvidia’s Cut Down Titan LE Becomes GeForce GTX 780

Wednesday, May 22, 2013

11:59 pm | Be Quiet: All Current Power Supplies Are Ready for Core i “Haswell”. Be Quiet Claims Top-to-Bottom Compatibility of PSUs with New Intel Chips

11:51 pm | OCZ Partners With Netgear to Deliver Flash-Based Data Center Storage in a Box Functionality to SMBs. Leading OCZ Enterprise-Class Deneva 2 SSDs Now Qualified on Netgear's ReadyDATA 516 NAS Device

11:07 pm | Half of the World’s Population Will Be Covered by 4G/LTE Networks by 2018 - Research. More Than 1 in 2 People Will Be Covered by 4G/LTE-FDD by 2018

9:38 pm | Sony Starts Manufacturing of PlayStation 3 in Brazil. Sony Begins to Make PS3 Game Consoles in Latin America

9:11 pm | Nvidia Grid Unleashes Graphics for Virtualized Desktops. Nvidia and Citrix Commercializes Grid Technology for Virtualized Desktops

8:57 pm | MIT Scientists Mix Graphene with Hexagonal Boron Nitride to Create New Material for Computer Chips. Researchers Create New Material for Semiconductors

8:43 pm | Intel Can Enable a Successful $200 PC in the Age of the Media Tablet – Analysts. Market Observers Mull Viability of $200 PCs on Current Market

8:09 pm | Microsoft Not Worried About Xbox One’s Lack of Backwards Compatibility, Vows Big Xbox 360 Announcement at E3. Microsoft Believes Xbox One Will Not Require Games of Xbox 360

7:52 pm | Asrock’s A-Style Mainboards Set to Be Waterproof. Asrock’s New Intel 8-Series Mainboards to Feature Conformal Coating

7:35 pm | Nvidia Announces PhysX and APEX Support for Microsoft Xbox One. Microsoft Xbox One Games to Use PhysX and APEX