News
 

Bookmark and Share

(1) 

ITU members have reached first-stage approval of G.fast, the new ITU broadband standard capable of achieving access speeds of up to 1Gb/s over existing telephone wires. Within 250-metre range of a distribution point, G.fast’s fibre-like speeds give service providers a tool to supplement and further monetize fibre to the home (FTTH) strategies with the customer self-installation benefits of ADSL2.

“G.fast’s development has followed an intensive work plan, meeting ambitious time-to-market objectives. The standard will enable service providers to deliver fibre-like performance more quickly and more affordably than with any other approach,” said Tom Starr, chairman of the expert group overseeing ITU-T standardization of access solutions.

G.fast, within the fibre to the distribution point (FTTdp) architecture, combines the best aspects of fibre and ADSL2. Consumers will have an over-the-counter solution, self-installed without a technician’s assistance, but equipped to support bandwidth-intensive services such as Ultra-HD 4K or 8K streaming and IPTV, advanced cloud-based storage, and communication via HD video. The physical-layer protocol aspects of G.fast defined by recommendation ITU-T G.9701 have reached the point of stability required to initiate the standard’s approval procedure. Chip manufacturers will now scale-up G.fast chip design and testing efforts, feeding results of this work into ITU-T Study Group 15 in the interests of finalizing G.fast as early as April 2014.

“From ADSL in 1999 to G.fast in 2014, ITU-standardized DSL solutions have multiplied access speeds by a factor of 125 over the past 15 years. It is to the credit of ITU’s membership and the dedication of engineers working in our study groups that ITU standards continue to maximize returns on investment in legacy ICT infrastructure,” said Hamadoun I. Touré, secretary-general at ITU.

ITU-T G.9701 is on track to achieving final approval in conjunction with ITU-T G.9700, which specifies methods to ensure that G.fast equipment will not interfere with broadcast services such as FM radio.

The G.fast project has attracted active participation from a large number of leading service providers, chip manufacturers, and system vendors. Companies involved in its development have already confirmed the standard’s gigabit-per-second capability through lab and field trials using prototype equipment based on mature drafts of the standard.

Service providers will benefit from ‘zero touch’ operations, administration and management; easing migrations to G.fast and increasing the speed of new-service rollouts. G.fast is designed to coexist with VDSL2, enabling service providers to play to the strengths of each standard in different environments; switching customers between G.fast and VDSL2 in line with dynamic business models. The standard will complement FTTH strategies, serving the many scenarios where G.fast is more cost-efficient than FTTH.

The development of the G.fast standard has been coordinated with Broadband Forum’s system architecture project, Fibre to the Distribution Point (FTTdp). Broadband Forum has begun developing a testing suite for G.fast systems, which will include test plans for interoperability events, system performance and functional testing; alongside a framework whitepaper, and possibly also a certification programme. ITU-T and Broadband Forum have been working in close collaboration to ensure that G.fast solutions can be quickly placed into FTTdp deployments.

Tags: G.Fast, ITU

Discussion

Comments currently: 1
Discussion started: 01/21/14 08:46:09 AM
Latest comment: 01/21/14 08:46:09 AM

[1-1]

1. 
250m? that's too short. We'd need a small DSLAM on each 3 or 4 houses, servicing like only 10 houses. For buildints maybe it's worth it, having a DSLAM on building's floor servicing everybody on it.

I remember the "last mile" term. 250m isn't 1 mile! lol

But still it'd too expensive. Just bring fiber to each home and that's it.
0 0 [Posted by: Hikari  | Date: 01/21/14 08:46:09 AM]
Reply

[1-1]

Add your Comment




Latest News

Thursday, August 21, 2014

10:59 pm | Khronos Group to Follow DirectX 12 with Cross-Platform Low-Level API. Khronos Unveils Next-Generation OpenGL Initiative

10:33 pm | Avexir Readies 3.40GHz DDR4 Memory Modules. DDR4 Could Hit 3.40GHz This Year

12:10 pm | AMD to Lower Prices of A-Series APUs for Back-to-School Season. New Prices of AMD A-Series APUs Revealed

Wednesday, August 20, 2014

10:53 am | AMD to Cut Prices on FX-9000, Other FX Processors: New Prices Revealed. AMD to Make FX Chips More Affordable, Discontinue Low-End Models

10:32 am | LG to Introduce World’s First Curved 21:9 Ultra-Wide Display. LG Brings Curved Displays to Gamers, Professionals

9:59 am | AMD Readies FX-8370, FX-8370E Microprocessors. AMD Preps Two New “Mainstream” FX Chips