News
 

Bookmark and Share

(0) 

Intel Corp., Samsung Electronics and Taiwan Semiconductor Manufacturing Co. have announced that they have reached agreement on the need for industry-wide collaboration to target a transition to larger, 450mm-sized wafers starting in 2012. The transition to larger wafers will enable continued growth of the semiconductor industry and helps maintain a reasonable cost structure for future integrated circuit manufacturing and applications.

Intel, Samsung and TSMC indicate that the semiconductor industry can improve its return on investment and substantially reduce 450mm research and development costs by applying aligned standards, rationalizing changes from 300mm infrastructure and automation, and working toward a common timeline. The companies also agree that a cooperative approach will help minimize risk and transition costs.

The companies will cooperate with the semiconductor industry to help ensure that all of the required components, infrastructure and capability are developed and tested for a pilot line by this target date.

Historically, manufacturing with larger wafers helps increase the ability to produce semiconductors at a lower cost. The total silicon surface area of a 450mm wafer and the number of printed die (individual computer chips, for example) is more than twice that of a 300mm wafer. The bigger wafers help lower the production cost per chip. Additionally, through more efficient use of energy, water and other resources, bigger wafers can help diminish overall use of resources per chip. For example, the conversion from 200mm wafers to 300mm wafers helped reduce aggregate emissions per chip of air pollution, global warming gasses and water, and further reduction is expected with a transition to 450mm wafers.

In the past, migration to the next larger wafer size traditionally began every 10 years after the last transition. For example, the industry began the transition to 300mm wafers in 2001, a decade after the initial 200mm manufacturing facilities were introduced in 1991.

Keeping in line with the historical pace of growth, Intel, Samsung and TSMC agree that 2012 is an appropriate target to begin the 450mm transition. Given the complexity of integrating all of the components for a transition of this size, the companies recognize that consistent evaluation of the target timeline will be critical to ensure industry-wide readiness.

“There is a long history of innovation and problem solving in our industry that has delivered wafer transitions resulting in lower costs per area of silicon processed and overall industry growth. We, along with Samsung and TSMC, agree that the transition to 450mm wafers will follow the same pattern of delivering increased value to our customers,” said Bob Bruck, vice president and general manager, technology manufacturing engineering in Intel’s technology and manufacturing group.

The three companies will continue to work with International Sematech (ISMI), as it plays a critical role in coordinating industry efforts on 450mm wafer supply, standards setting and developing equipment test bed capabilities.

Discussion

Comments currently: 0

Add your Comment




Related news

Latest News

Monday, July 21, 2014

12:56 pm | Microsoft to Fire 18,000 Employees to Boost Efficiency. Microsoft to Perform Massive Job Cut Ever Following Acquisition of Nokia

Tuesday, July 15, 2014

6:11 am | Apple Teams Up with IBM to Make iPhone and iPad Ultimate Tools for Businesses and Enterprises. IBM to Sell Business-Optimized iPhone and iPad Devices

Monday, July 14, 2014

6:01 am | IBM to Invest $3 Billion In Research of Next-Gen Chips, Process Technologies. IBM to Fund Development of 7nm and Below Process Technologies, Help to Create Post-Silicon Future

5:58 am | Intel Postpones Launch of High-End “Broadwell-K” Processors to July – September, 2015. High-End Core i “Broadwell” Processors Scheduled to Arrive in Q3 2015

5:50 am | Intel Delays Introduction of Core M “Broadwell” Processors Further. Low-Power Broadwell Chips Due in Late 2014