News
 

Bookmark and Share

(2) 

Taiwan Semiconductor Manufacturing Company said that it would build the first pilot production line that processes 450mm wafers in 2013 - 2014 timeframe and would start mass production of semiconductors on 450mm wafers in 2015 - 2016. The announcement shows confidence of the world's largest contract maker of chips in necessity to transit to larger wafers.

"I want to say a few words about the 450mm wafer manufacturing. Our first 450mm pilot line is planned at our Fab12 Phase VI, starting with 20nm technology. The timing of pilot line will be around 2013, 2014. Our first 450mm production line is planned in around 2015, 2016," said Morris Change, chief executive officer and chairman of TSMC, during a recent conference call with financial analysts.

The rather bullish plans of TSMC indicate that the company either has finalized plans or nears their finalization. Moreover, it means that the contract maker of semiconductors is confident in suppliers of equipment capable of processing large 450mm wafers.

A lot of things do depend on equipment manufacturers since neither of them is unlikely to start building expensive pieces of equipment unless there are customers for those tools, which are not just considering, but are committed to acquire the equipment.

In fact, some analysts already believe that the claim by TSMC actually changes everything for 450mm fabs in general.

''The importance of this is that back in the 300mm days, things really did not get going until TSMC announced a real fab. There was a lot of table pounding, but the supply base doesn’t get rolling until there are real orders. Orders are not real until there is a fab in play. That means that you can expect Samsung and GlobalFoundries to put 450mm into their plans immediately. I would bet Samsung will be first or it may well come as a Common Platform alliance deal,'' said G. Dan Hutcheson, chief executive officer of of VLSI Research. 

Tags: TSMC, 450mm, Semiconductor

Discussion

Comments currently: 2
Discussion started: 02/03/11 01:20:32 AM
Latest comment: 02/11/11 09:44:54 PM
Expand all threads | Collapse all threads

[1-1]

1. 
Really slow transition ...
0 0 [Posted by: East17  | Date: 02/03/11 01:20:32 AM]
Reply
- collapse thread

 
Really. You should deliver it faster cause we desperately need it.
0 0 [Posted by: OmegaHuman  | Date: 02/11/11 09:44:54 PM]
Reply

[1-1]

Add your Comment




Related news

Latest News

Friday, May 24, 2013

6:09 pm | Second-Generation Kinect Sensor for Windows Due in 2014 – Microsoft. Microsoft Discloses Additional Details About Kinect 2

4:24 pm | New Technique May Open Up an Era of Atomic-Scale Semiconductor Devices. Atom-Scale Semiconductor Devices May Be Incoming, Thanks to New Researchers

Thursday, May 23, 2013

11:30 pm | Kinect Support Is Not Mandatory for Xbox One Video Games – Microsoft. Microsoft Will Not Require Compulsory Support of Kinect from Xbox One Games

11:20 pm | Thermaltake Publishes List of PSUs Compatible with Intel Cori i “Haswell” Chips. 20 PSUs from Thermaltake Are Compatible with Next-Gen Intel Chips

11:10 pm | European Amazon Stores Start to List Xbox One with €599 Price-Tag. Microsoft Xbox One May Cost €599 in Europe, If First Listings Are Correct

9:28 pm | Apple to Assemble Macs in Texas, Set to Manufacture Parts Across the U.S. Apple’s Plan to Move Production Back to U.S. Gets Shape

9:12 pm | Microsoft Confident in Lack of Quality Issues with Xbox One Hardware. Microsoft Vows Xbox One Will Not Have RROD-Like Issues

8:52 pm | AMD Officially Launches New-Generation APUs for Mobile Applications [UPDATED]. AMD Introduces Kabini, Temash and Richland Accelerated Processing Units

6:51 pm | OCZ Reveals Vertex 450 Solid-State Drives: High-End Performance at Mainstream Prices. OCZ Introduces New SSDs Based on Indilinx Barefoot 3 Controller

3:40 pm | Nvidia Unveils GeForce GTX 780: GK110-Based Consumer Solution for $649. Nvidia’s Cut Down Titan LE Becomes GeForce GTX 780