News
 

Bookmark and Share

(0) 

Toshiba Corp. on Tuesday said that it will rebuild its semiconductor manufacturing operations in Thailand by relocating Toshiba Semiconductor Thailand to a new manufacturing facility. The move will position the company to meet future growth in demand and replace the factory inundated by the 2011 floods.

Established in 1990, TST carries out back-end processes – assembly and packaging – for small signal devices and photocouplers. Small signal devices control current and voltage in digital consumer products, a product segment that is expected to grow in coming years, with a primary focus on smart phones and tablets PCs. Photocouplers are used widely in industrial products, such as inverters, and are also expected to see strong demand growth.

The new facility will be located at the 304 Industrial Park, Prachinburi, approximately 140km northeast of Bangkok and will replace TST's facilities at Bangkadi Industrial Park in Pathumthani, in the suburbs immediately north of Bangkok. The new site is at 15 to 20 meters above sea level and outside Thailand's main drainage basins, with no major rivers, so it offers TST advantages in the viewpoint of business continuity planning (BCP). Construction of a two-story building will begin in July, on a lot with an area of approximately 135 thousand square meters, 1.4 times the size of the Bangkadi lot.

Construction of the factory will allow TST and Toshiba Group to respond flexibly to market demand with facilities offering greater operating efficiency and higher productivity. The plant is scheduled for completion next spring and mass production is slated to start in the second quarter (April-June) of 2013.

The initial investment of the facility including the cost of the construction will be largely met by flood insurance settlements and is not expected to impact on the results of Toshiba's semiconductor business. Future investment and production expansion will be flexibly determined in light of market trends and customer needs.

Last year's flooding completely inundated TST's manufacturing facilities, resulting in a forced suspension of operations. As TST made every effort to recover operations, Toshiba responded with a BCP based on transferring operations to its production facilities in Japan and Malaysia and making use of outsourcing.

Tags: Toshiba, Semiconductor

Discussion

Comments currently: 0

Add your Comment




Related news

Latest News

Friday, May 17, 2013

11:50 pm | Sales of Nintendo Wii U Hit Another Low in the U.S. Nintendo Wii U Just Cannot Become Popular

Thursday, May 16, 2013

11:41 pm | Dell Admits Windows 8 Did Not Meet Expectations, Pins Hopes on “Blue” Updates. Dell Disappointed with Windows 8, But Believes in the Future

10:59 pm | AMD Needs More Than Game Console Design Wins to Offset PC Market Declines – Analysts. AMD Has to Develop Competitive Product Lineup to Survive in Current Environment

10:33 pm | Corning Introduces Corning Lotus XT Glass for High-Performance Displays. Corning Advances Glass Substrate for High-Performance Displays

9:51 pm | True Stereo-3D Will Require 330MP – 3.3GP Resolutions, Says Developer of 8K Video Format. NHK: 8K Is the Final 2D Format, All Future Formats Will Be in 3D

9:41 pm | Innodisk Begins to Ship DDR4 RDIMM Samples to Server Makers. Independent DIMM Supplier Samples DDR4 RDIMMs

8:56 pm | Samsung Develops 45nm Embedded Flash Logic Process Technology. Samsung Successfully Tests 45nm Embedded Flash Logic Manufacturing Tech

7:57 pm | NHK Shows World’s First 8K Movie at Cannes Film Festival. Japanese National Broadcasting Company Demos 8K Movie, Content to Film Industry

7:27 pm | Intel’s Paul Otellini: Lack of Chip for iPhone, iPad Was My Worst Mistake. Intel’s Outgoing CEO Regrets About Mission Opportunities with Apple iOS