News
 

Bookmark and Share

(3) 

Taiwan Semiconductor Manufacturing Co. will begin to install manufacturing equipment that will be utilized to make chips using 20nm process technology later in April, around two months ahead of TSMC’s own schedule. In case all goes well, then TSMC will be able to manufacture 20nm chips in commercial volumes starting late this year.

On April 20, TSMC, the world’s largest contract makers of semiconductors, will start to install new equipment that is needed to manufacture various chips using 20nm process technology into its new Fab 14/phase 5 facility, reports FocusTaiwan. The company has reportedly sent more than 100 engineers to equipment manufacturers in the United States, Europe and Japan to “conduct quality checks to make sure that its new plant can start operations in the new time frame”.


TSMC Fab 14

As it appears, the company decided to accelerate the launch of Fab 14/phase 5 by around two months so that to be able to produce chips on 20nm node in higher volumes already this year. Previously it was announced that TSMC's 20nm technology is scheduled to begin volume production at TSMC's Fab 12/phase 6 this year.

Many believe that TSMC’s intention to boost volume output of 20nm chips in calendar 2013 is related to the company’s negotiations with Apple, which needs extremely high volumes of chips as well as state-of-the-art manufacturing technology. Given the fact that TSMC’s 20nm process technology will come only in one version and will neither be tailored for performance nor power consumption, but will attempt to address completely different needs, not all customers of TSMC will use it. As a result, quick ramp up of 20nm means that the contract manufacturer expects particular high-volume client or clients (e.g., Qualcomm, Nvidia, AMD) to adopt it.

TSMC began to build the phase 5 of its Fab 14 in early April, 2012. The construction of the facility is now complete and it will take from six to twelve months to fully equip the fab completely.

Fab 14 is TSMC's second 300mm GigaFab following Fab 12 phase 1 facility that began volume production in 2004. With phases 1, 2, 3 and 4 now in operation, Fab 14 has capacity of 550 thousand 300mm wafers per quarter, making it the world's largest 300mm fab. Combined with the planned Fab 14 phase 6, total cleanroom area of Fab 14 will reach 87 000m2 square meters The output of Fab 14 phases 1 through 4 has an estimated annual revenue of $6 billion, and TSMC expects the combined annual revenue of phases 5 and 6 to reach a similar scale.

TSMC and Apple did not comment on the news-story.

Tags: TSMC, Semiconductor, 20nm, 28nm, 300mm, Apple, AMD, Nvidia, Qualcomm

Discussion

Comments currently: 3
Discussion started: 04/04/13 03:59:27 PM
Latest comment: 04/07/13 09:07:01 PM
Expand all threads | Collapse all threads

[1-2]

1. 
"Given the fact that TSMC’s 20nm process technology will come only in one version and will neither be tailored for performance nor power consumption, but will attempt to address completely different needs"

Any chance we can get an expansion on this statement? What sector is their 20nm process targeting exactly?
0 0 [Posted by: daneren2005  | Date: 04/04/13 03:59:27 PM]
Reply
- collapse thread

 
It will be somewhere in the middle, good at both, but not fantastic at either. Its primary goal will be more chips per wafer, driving the price down.
1 0 [Posted by: BillionPa  | Date: 04/04/13 05:49:10 PM]
Reply

2. 
Coming up next:

TSMC: "We're having unexpected yield issues".
0 0 [Posted by: AnonymousGuy  | Date: 04/07/13 09:07:01 PM]
Reply

[1-2]

Add your Comment




Related news

Latest News

Monday, April 14, 2014

8:23 am | Microsoft Vows to Release Xbox 360 Emulator for Xbox One. Microsoft Xbox One May Gain Compatibility with Xbox 360 Games

Tuesday, April 1, 2014

10:39 am | Microsoft Reveals Kinect for Windows v2 Hardware. Launch of New Kinect for Windows Approaches

Tuesday, March 25, 2014

1:57 pm | Facebook to Acquire Virtual Reality Pioneer, Oculus VR. Facebook Considers Virtual Reality as Next-Gen Social Platform

1:35 pm | Intel Acquires Maker of Wearable Computing Devices. Basis Science Becomes Fully-Owned Subsidiary of Intel

Monday, March 24, 2014

10:53 pm | Global UHD TV Shipments Total 1.6 Million Units in 2013 – Analysts. China Ahead of the Whole World with 4K TV Adoption

10:40 pm | Crytek to Adopt AMD Mantle Mantle API for CryEngine. Leading Game Developer Adopts AMD Mantle

9:08 pm | Microsoft Unleashes DirectX 12: One API for PCs, Mobile Gadgets and Xbox One. Microsoft Promises Increased Performance, New Features with DirectX 12

3:33 pm | PowerVR Wizard: Imagination Reveals World’s First Ray-Tracing GPU IP for Mobile Devices. Imagination Technologies Brings Ray-Tracing, Hybrid Rendering Modes to Smartphones and Tablets

2:00 pm | Nokia Now Expects to Close Deal with Microsoft in Q2. Sale of Nokia’s Division to Close Next Month